ryanhomesdunkirk.blogspot.com
Baird Bliss: Building our Ryan Homes Dunkirk : June 2015
http://ryanhomesdunkirk.blogspot.com/2015_06_01_archive.html
Baird Bliss: Building our Ryan Homes Dunkirk. Ryan Homes development, Nature's Preserve in Twinsburg Township, Ohio. Monday, June 22, 2015. For those who have a sump pump, Ryan Homes strongly suggests you have a backup battery installed. Why? Well, if the power goes out, the sump pump won't work and your basement might take on water. Or something like that. I heard that the sump pump failed to work in my neighbors house and his basement filled up with water so I decided to bite the bullet and have it done.
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: 23 March 2015 - Day 97 - Private Inspection
http://settleinrome.blogspot.com/2015/03/23-march-2015-day-97-private-inspection.html
Settle in Rome - A Home by Ryan Homes. Tuesday, March 24, 2015. 23 March 2015 - Day 97 - Private Inspection. So we had a private inspector come inspect the house today to make sure there wasn't any major issues before we closed on Thursday. A couple of things the inspector noted was a lightswitch that would not turn off all the way, and blown insulation in the A/C / Furnce drain pan, which could cause a clog. Other than that below are a handful of things I came across:. Pin holes in the bathroom grout.
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: 16 March 2015 - Day 90 - Driveway Prep & wifey gets in a box
http://settleinrome.blogspot.com/2015/03/16-march-2015-day-90-driveway-prep.html
Settle in Rome - A Home by Ryan Homes. Tuesday, March 17, 2015. 16 March 2015 - Day 90 - Driveway Prep and wifey gets in a box. Looks like they prepped the driveway. Wifey decided to get up all in that hoe. ;-) see what I did there. Lol. Not the brightest people in the world. I guess one on the socket wires got loose so the drywall guys just poked a hole through the sheetrock and let the wire dangle. Looks like it got corrected. Shower prepped for tile. Tub is also prepped for tile. Wifey gets in a box.
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: Selections
http://settleinrome.blogspot.com/p/selections.html
Settle in Rome - A Home by Ryan Homes. Elevation E - All Vinyl - Brick to Grade 4-sides - Caramel Brick. Spanish Olive Vinyl / White Trim. Natural Almond Shake Siding. Tricorn Black Door / Shutters. Vaulted Ceiling in Master Bedroom. Ceiling Fan Rough-In all Rooms except for Dining/Living Room. Tiled / Upgraded Shower / Tub in Master. Gourmet Kitchen Island Upgrade. 42" Kitchen Cabinet Upgrade - Rushmore Hazelnut Glaze. Family Room / Study - Graystone Seattle Mist Carpet. Subscribe to: Posts (Atom).
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: Progression Pictures
http://settleinrome.blogspot.com/p/progression-pictures.html
Settle in Rome - A Home by Ryan Homes. Unfortunately I wasn't organized from the beginning so I do not have the same angle of the build throughout the construction period. Day 70 - Morning. Day 70 - Evening. Subscribe to: Posts (Atom). Our Journey to Naples. Special Thanks and Pics. Our Naples adventure in Shorewood, Illinois! Baird Bliss: Building our Ryan Homes Dunkirk. The NIGHTMARE that is General Electric. Building Our New Ravenna Ryan Home. Finished House and Ready to Sell!
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: 14 March 2015 - Day 88 - A broom and some chit chat
http://settleinrome.blogspot.com/2015/03/14-march-2015-day-88-broom-and-some.html
Settle in Rome - A Home by Ryan Homes. Saturday, March 14, 2015. 14 March 2015 - Day 88 - A broom and some chit chat. Another day shot due to the heavy rains we had today. We ran over to Lowes this morning to inquire about blinds, and schedule delivery of the Washer/Dryer and Fridge for the day after closing. We've been postponing delivery since we purchased them on Black Friday. BTW: Lowes is offering 25% off on certain custom blinds till 25 March. Finished granite and a broom awaiting to meet the floor.
ryanverona56.blogspot.com
Building our Verona with Ryan Homes: February 2015
http://ryanverona56.blogspot.com/2015_02_01_archive.html
Building our Verona with Ryan Homes. Saturday, February 28, 2015. So Close.Yet So Far Away. The dates are set! Our closing date is scheduled for March 31st and our Home Orientation is March 26th. I can't wait! Guardian was at the house doing final installation of our selections. All siding is on and we have some shutters! All of our stone is piled up out front. Can't wait to see it installed! Just a little messy. 1st Floor Full bath. Monday, February 16, 2015. Loving Our Exterior Selections. View from th...
myryanhomesmilan.dustinmoses.com
Ryan Homes Milan: New Home Construction Experience: March 2016
http://myryanhomesmilan.dustinmoses.com/2016_03_01_archive.html
Ryan Homes Milan: New Home Construction Experience. Friday, March 25, 2016. We've got Counter-tops and Appliances! The one issue we found out is that the counter-top installers cracked the piece of granite that is supposed to connect the breakfast bar to the counter-top. basically a granite back-splash that goes behind the sink. Was told they had to order a new piece and it would be installed soon. We're a week and a half from closing! One coat of paint. Here's the ONE picture from today:. This past week...
myryanhomesmilan.dustinmoses.com
Ryan Homes Milan: New Home Construction Experience: February 2016
http://myryanhomesmilan.dustinmoses.com/2016_02_01_archive.html
Ryan Homes Milan: New Home Construction Experience. Sunday, February 28, 2016. Framing Complete - Moving Along. Framing Done. on to Plumbing and HVAC. This past week was, apparently, a busy one! Here's a run down of our progress at this point:. Want to also give credit to my PM's (we now have two), Andrew and Bryan, and the trade crews for doing an exceptional job with the framing, plumbing, and HVAC. I was pretty impressed and everything I asked for was done! And now for the onslaught of photos! Furnace...
myryanhomesmilan.dustinmoses.com
Ryan Homes Milan: New Home Construction Experience: January 2016
http://myryanhomesmilan.dustinmoses.com/2016_01_01_archive.html
Ryan Homes Milan: New Home Construction Experience. Saturday, January 30, 2016. Anyways, because I was so upset about the whole thing, they agreed to put in the basement window which I am absolutely THRILLED about. I'm very happy that my PM seemed genuinely caring about the matter and basically corrected a problem that wasn't his fault - he doesn't draw the floor plans for Ryan Homes, after all. So. I believe I can FINALLY PUT THIS ISSUE TO REST. Close-up of our newly cut basement window. PM e-mails me b...