nothingupstairs20817.wordpress.com
Potty Time! | Nothing Upstairs
https://nothingupstairs20817.wordpress.com/2011/07/17/potty-time
The evolution of a 1960s rambler to our 2012ish dream home. Larr; Protective Measures. July 17, 2011. It’s unfortunate that Jack’s not quite ready to give up his diapers seeing as we now have the perfect training ground. Greff waves in the delivery truck. One Comment on “Potty Time! Lumber Yard « Nothing Upstairs. July 22, 2011 at 9:32 pm. 8230;] week, the house really started to look like a construction site. First, the port-a-potty was delivered. Then came the floor […]. Leave a Reply Cancel reply.
nothingupstairs20817.wordpress.com
Lumber Yard | Nothing Upstairs
https://nothingupstairs20817.wordpress.com/2011/07/22/lumber-yard
The evolution of a 1960s rambler to our 2012ish dream home. Larr; Five Days in Canada. July 22, 2011. Behind in my updates and it has been an eventful 10 days to say the least. Last week, the house really started to look like a construction site. First, the port-a-potty. Was delivered. Then came the floor joists. And then, the roof trusses…. Which were crying for photo opps…. The next couple of posts will be photo essays, as Scott and I were out of town for the two biggest days in this project so far!
nothingupstairs20817.wordpress.com
Elevations | Nothing Upstairs
https://nothingupstairs20817.wordpress.com/elevations
The evolution of a 1960s rambler to our 2012ish dream home. Front of house: Front elevation. Back of house: Rear elevation. Side as viewed from street (we’re on a corner): Right side. Side as viewed from neighbor’s house: Left elevation. PS – Said neighbors are 84 and 90. She is not so thrilled with the prospect of our construction, yet is going to be surrounded, as the people directly behind them are about to tear-down, re-build. Change is hard. One Comment on “Elevations”. March 28, 2011 at 12:11 pm.
nothingupstairs20817.wordpress.com
Nothing Upstairs | The evolution of a 1960s rambler to our 2012ish dream home | Page 2
https://nothingupstairs20817.wordpress.com/page/2
The evolution of a 1960s rambler to our 2012ish dream home. July 12, 2011. On hot days, they encourage you to drink more water. Today, Greff went straight to the source for his refreshment. Greff: Well, we found the water line the hard way. Me: Uh, ok. Greff: I’ll be back in an hour – just on my way to get the materials to fix the pipe. Hopefully will have the water back on by 2 or so. Me: Uh, ok. Can you bring some bottled water for Jack since its supposed to be 100 degrees out today? July 12, 2011.
nothingupstairs20817.wordpress.com
Rain, rain, go away | Nothing Upstairs
https://nothingupstairs20817.wordpress.com/2011/09/02/rain-rain-go-away
The evolution of a 1960s rambler to our 2012ish dream home. Us, Ourselves, and Irene. Rain, rain, go away. September 2, 2011. For the first three weeks of this project, we sang Mother Nature’s praises. While it was unbelievably hot, we felt to rain. It seems we were in a rain bubble with areas all around us (and as close as a mile or two away) seeing far more showers than we. It was like the clouds knew we needed a reprieve. To: Hillary and Scott. To: Greff (cc Scott). Leave a Reply Cancel reply. A film ...
nothingupstairs20817.wordpress.com
Floorplans | Nothing Upstairs
https://nothingupstairs20817.wordpress.com/floorplans
The evolution of a 1960s rambler to our 2012ish dream home. As built – Floor plan on the day we took ownership. The “before.” As Built. Main level – Reflects the complete redesign/renovation circa late 2009. “Exist” rooms noted are their eventual use. “New” porch and deck are to be done as part of the next phase. Main Level. Upper – New second story. Second Story. 4 Comments on “Floorplans”. Site Plans « Nothing Upstairs. March 28, 2011 at 12:11 pm. 8230;] Floorplans Comfortable Elegance → […]. Join 7 ot...